Back in August we were ready to start finishing out our basement. We had drawn up plans with an architect, got our permit from the city and started lining up plumbing, electrical, etc. Jimmy acted as the general contractor for the job and managed all the subs and kept everything moving along. We picked out all fixtures and finishes together except for a few I had to pick out by myself in a rush when the ones we had ordered didn't come in in time. Our basement is the same footprint of our house so there is a lot of space down there! We planned a bedroom, full bathroom, craft/music room, storage/mechanical room, bar, living room, play room and a workshop big enough for Jimmy to work in.
Looking from where the bedroom is now all the way to the far wall where stairs come down.
This is now the bar and the door to the bathroom is inside the hallway.
Stairs before. We cut half the wall down so it was open at the bottom.
Looking from the living room. The playroom is the room where the double doors are. The far end is where the bedroom will be and the workshop next to it.
Where the bar will be.
We moved a few walls and had to cut the concrete to move a little plumbing but otherwise didn't make too many changes. There was a lot of pipes and ductwork that just couldn't be moved so we had to tray most of the ceilings in the rooms to get as much height as we could.
Drywall went up! This is from the living room facing the stairs and Jackson is standing where the bar will be.
Under the stairs. We finished it and even installed lights and carpet for the kids to have a fort.
The bedroom. They installed the AC unit directly in front of the window! Clearly this was going to be moved. Not acceptable! There also used to be another set of windows in this room but we wanted a wall to put the bed on with no window behind it so we framed it in and drywalled over it.
From the playroom into the living room
Bar is to the right, playroom to the left
Such a mess! So much stuff to go through and get rid of. Plus Jimmy's 2 drumsets under the blankets trying to keep them clean. p.s. Not possible to keep anything clean while doing drywall/sanding etc!
Sheetrock is mudded and trim is going up around windows and doors
Closet in the craft/music room
Jimmy built the knee wall for the bar
Sheetrock scraps. This is what you get when you don't have a dumpster.
Jimmy found this awesome greyish wood planks he used as the outside of the bar.
Jimmy and his dad built a window seat in the playroom. Walls are painted and windows/doors are stained! Wall color is Light French Grey by SW.
So many boxes...cabinets were delivered!
Stained barn doors for outside the playroom
Lights are in! I had to choose the pendant lights spur the moment when ours didn't come in in time. I think I love these even better than the other ones we had ordered!
Playroom. It's always a struggle agreeing on fans but somehow we both found ones we really liked!
Wall sconces in the bedroom
Bar
We wanted to keep the bar from sticking out too far in the room so we went with a 12" deep cabinets on one side.
We got our floors in!
Started hanging the barn doors
Yay! Countertops are installed!
It's all starting to come together!
Carpet installed in the craft/music room and the bedroom
Entertainment cabinet installed with granite too. Jimmy hung the grey wood behind where the TV will be hung.
Farm sink in the bar
Bathroom is now complete with the shower glass installed
Craft desk Jimmy built for me
Finished (almost) product! Still need to add the brick wall behind the bar and need more decor
The living room. I am in love with the furniture we picked out. I always thought I wanted a big sectional but wound up with a sofa and 4 swivel chairs and some ottomans. Love the setup we went with!
Hadn't gotten a bed yet for the bedroom and the boys love playing and watching shows in there
We love having movie night in the basement now. This night was The Jetsons. Loved that flashback for myself. I used to love the show!
I sewed little curtains for the playroom to hide the toys behind
Finally got the banister installed just in time for the inspector to sign off for the final inspection!